In March 2012, Vergo was awarded a Design-Construction tender to build Metro Richelieu Inc.’s new Fruit, Vegetable and Dairy Distribution Centre.
Nearly 10 years later, this long-time client once again commissioned Vergo for its 40,000 square foot expansion.
Customer: Metro Richelieu Inc.
Contact: 1600 Mount Masson – Laval (QC) H7E 4P2
Project: Completed
Contract type: Management
Value: 22.7 M$
Years of achievement: 2022 – 2023
Industrial buildings are very varied because of the unique processes they house. It is therefore essential to understand them. Vergo has a successful track record in this sector, particularly for its ability to integrate the latest automation technologies.
Whether it’s a warehouse, a factory, a food assembly line, a mill or any other industrial facility, Vergo builds buildings that work.
In the agri-food sector, Vergo mainly designs power plants that are fully compliant with the Hazard Analysis Critical Control Point (HACCP) system. This system, recognized around the world, is interested in the 3 classes of dangers for food hygiene, which are biological, chemical and physical dangers.
The Canadian Food Inspection Agency (CFIA) has implemented the Food Safety Improvement Program (APAS). As a result, the majority of power plants designed by Vergo comply with pasA and HACCP processes. As a result, Quebec agri-food companies can export their products globally.
For more than 25 years, Vergo has applied robust construction expertise to each project. Our team has a passion for quality and a commitment to satisfying customers across Canada.