Gordon Food Service distribution centre – Boucherville

Construction Vergo - Entrepreneur en construction commerciale, industrielle et institutionnelle au Canada
Category
Food industry, Industrial
Tags
Boucherville, canada, food industry, Gordon Food Service, industrial, industrial construction, montreal, quebec, warehouse
About This Project

Following an initial expansion in 2018, Gordon Food Service once again hired Vergo to expand its Boucherville distribution centre. This time, it is a 57,000 square foot expansion which will accommodate a freezer and a cold room.. Loading docks and offices are also being added and water retention work in the existing parking lot has been carried out..

 

Customer: GFS Properties LTD

www.gfs.ca

Contact: 550 Louis-Pasteur, Boucherville, Quebec, J4B 7Z1

Project: In progress

Contract type: Design-build

Value: 12,0 M$

Area: 57 000 square foot

Years of achievement: 2023 – 2024

 

Productive buildings

Industrial buildings are very varied because of the unique processes they house. It is therefore essential to understand them. Vergo has a successful track record in this sector, particularly for its ability to integrate the latest automation technologies.

Whether it’s a warehouse, a factory, a food assembly line, a mill or any other industrial facility, Vergo builds buildings that work. From simple storage spaces to full distribution centers, our buildings offer the capabilities you need, while minimizing your operating costs.

In the agri-food sector, Vergo mainly designs power plants that are fully compliant with the Hazard Analysis Critical Control Point (HACCP) system. This system, recognized around the world, is interested in the 3 classes of dangers for food hygiene, which are biological, chemical and physical dangers.

The Canadian Food Inspection Agency (CFIA) has implemented the Food Safety Improvement Program (APAS). As a result, the majority of power plants designed by Vergo comply with pasA and HACCP processes. As a result, Quebec agri-food companies can export their products globally.

In some cases where compliance with both systems is not mandatory, Vergo may also design custom power plants to meet the demands of its customers.

For more than 25 years, Vergo has applied robust construction expertise to each project. Our team has a passion for quality and a commitment to satisfying customers across Canada.